The cooling tower balance pipe is the connecting pipe of the cooling tower, and its role is very important. So what are its functions and advantages? Today, the editor of China trlon cooling tower introduced some knowledge of cooling tower balance pipes to you.
The function of the cooling tower balance pipe is to ensure uniform water flow and close pressure in each tower, so that there will be no excessive water volume and the other small water volume. When the cooling tower is installed in multiple parts and in combination, the connecting pipe between the water collecting pans is what we call the cooling tower balance pipe. Its function is mainly used to balance the water level between the cooling tower water trays, to ensure uniform water flow and close pressure between the towers, and there will be no situation where the water volume of the other is too large and the water volume of the other is small. When the water in the catchment pan of a certain cooling tower increases suddenly, the excess water will flow to the catchment pans of other cooling towers through the balance pipe instead of overflowing.
The reason why the cooling tower is full of water and there is no water. The two towers are not at the same level, and there should be a valve to control the backwater of the two towers. Otherwise, when the first tower pumps back water, there is likely to be a time for pumping water. When the cooling tower balance pipe is usually composed of several modules, the water level in the matched pipe groove is the same. The more modules, the greater the possibility of need.
What are the reasons why cooling towers need to use cooling tower balance pipes
1. The basic level is not good at first.
2. Poor pressure distribution at the inlet of the water pipe.
If the cooling tower balance pipe is not added, some piping grooves may overflow, but some piping grooves are dry.
The cooling tower balance pipe installation method is to use the cooling tower balance pipe when only two or more cooling towers are installed. If you want to ensure that the balance pipe cooling tower is at the same level, connect the cooling tower chassis to each other with pipes. Can be installed.
Article Address:https://www.trlen.com/news/558.html
Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.
Contact:Mr. Wang
Free Hotline:4008-8383-95
Company Email:sales@trlon.com
Web Site:https://www.trlen.com/
Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen