Have you really understood the role of cooling towers? In fact, cooling towers exchange waste heat of cooling water with air in the tower to realize the transfer of waste heat. It is based on this principle that the cooling tower can also realize the recycling of waste heat. How does the cooling tower specifically realize the recycling of waste heat? Next, the cooling tower manufacturer trlon will share with you.
Take the boiler heating water as an example. After the water is heated, a relatively high-temperature high-pressure steam is formed, which then drives the steam turbine to generate electricity. Then the exhaust gas is discharged into the condenser, and with the help of the cooling tower, the exhaust gas is turned into water and returned to the boiler for recycling.
In this process, waste heat will be transferred to the cooling water in the cooling tower, causing the temperature of the water to rise. At the same time, the large amount of heat generated above can also be transferred to the air, so it may be more effective if other equipment is configured.
Cooling tower is through the heat conduction of circulating cooling water and cold and dry air, combined with the evaporation of circulating cooling water, before the gasification latent heat can be removed to reduce the water temperature. In other words, when the cooling tower is in operation, it needs to have a certain pressure cycle.
In this state, the cooling water enters the cooling tower through the water inlet pipe, and then it is atomized by the swirling spray action of the atomizer of the cooling tower, and finally forms mist and sprays toward the top of the tower. At the same time, the reverse thrust generated by the cooling tower will drive the automatic rotating device to rotate, so that the entire atomized water fills the entire tower.
Article Address:https://www.trlen.com/news/221.html
Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.
Contact:Mr. Wang
Free Hotline:4008-8383-95
Company Email:sales@trlon.com
Web Site:https://www.trlen.com/
Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen