Industrial cooling tower materials are generally carbon steel, stainless steel and copper, is a kind of water circulation cooling equipment. It is widely used in chemical plants, cement plants, power plants and other industries and has a good development, which brings considerable convenience to these industries. So, how to improve the energy saving effect of industrial cooling towers? The following Xiaobian to introduce the next.
1. Industrial cooling towers are mostly sealed structures with poor ventilation effect. If the ventilation effect can be further improved in the later period, the cooling efficiency of its operation will also be improved.
2. The inner part of the industrial cooling tower is composed of different components. We can re-coordinate and optimize the system operation to see if we can improve the energy saving effect.
3. For industrial cooling towers, coolant is the key to the refrigeration effect. Whether a good coolant can be designed is a great suspense.
Therefore, we can purchase cooling tower products according to our own use needs, so as to make the products play their own advantages and role quite well.
What should be done before starting the cooling tower?
Any failure to prepare a device before startup increases the likelihood of problems during operation. The purpose of preparation is to reduce the likelihood of problems after operation. Then, what should be done before the start of the cooling tower to ensure that the equipment can work normally after operation, the following Xiaobian to introduce to you.
First, for the capital construction and the cooling tower after major or minor repair, the receiving system should be strictly implemented. In addition to the inspection and acceptance according to the relevant standards, the following matters should be paid attention to.
1. For the newly built and repaired cooling towers, check the water supply pipeline, main gate, shortcut door and water discharge gate, which should be in good condition and in the fully closed position.
2. Check that the water distribution system, water drenching device, collecting tank, air inlet and backwater ditch are in good condition and have been cleaned.
3. Confirm that there is no operation in the tower, and check that tools, springboard, foot lever and remaining materials have been cleared out of the tower.
4. After the construction and overhaul of the cooling tower is completed, the leading group of the experience and collection shall precheck that it shall be allowed to enter the trial operation adjustment stage after reaching the acceptance standard reactor, and then it shall be allowed to enter the formal operation after passing the acceptance and identification.
In addition, the relevant gate of the cooling tower should be kept in good condition and operate flexibly. Electric valves should be regularly measured motor insulation. After long-term disuse or major or minor repairs, the insulation of the motor should be measured first and the operation should be conducted after confirming that it is in good condition.
Article Address:https://www.trlen.com/baike/353.html
Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.
Contact:Mr. Wang
Free Hotline:4008-8383-95
Company Email:sales@trlon.com
Web Site:https://www.trlen.com/
Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen