There are many cooling towers built in large central air conditioning, most of which can be divided into counter-current cooling towers and cross-flow cooling towers. What are the detailed requirements for installation and use of cooling towers? Trlon below will sort out the following specific contents for you to further understand cooling towers.
Cooling tower installation and use requirements
1. The installation and use of cooling towers shall be in accordance with various conditions of the equipment, taking into account the ground and loading effect of the place where they are installed and used, as well as the necessary external conditions.
2. The tower should be placed horizontally. Towers when used in the engineering construction installation, to avoid crush chassis, the staff should be on the reinforcement of the chassis, the installation using the tower chassis, chassis parts, such as cellulose to avoid chassis, chassis and other variant can wear screw first, then slowly tighten individually, the chassis is determined not to distort, under the condition of surrounding clean, dry, to prevent use it ooze water can be laid in touch place felt of fiber and resin coated.
3. During installation and use, attention should be paid to the drawing design of cooling tower to make concrete foundation or steel structure foundation. Horizontal steel plates should be embedded in the foundation of such cooling tower, and the elevation of each foundation point should be on the same level.
Above is trlon use needs to introduce the installation of the cooling tower, trlon committed to guangdong closed cooling tower, closed cooling tower price, closed cooling tower, dry-wet combination of closed cooling tower equipment manufacturing and sales, trlon adjustable has the advanced production equipment, complete processing technology, can ensure that closed cooling towers, closed cooling tower price, closed cooling tower, dry-wet combination of closed cooling tower and the purchase price, product quality for consumers to purchase cost-effective equipment, if you have cooperation intention, please call strategic cooperation talks.
Article Address:https://www.trlen.com/baike/284.html
Guangdong Trlon Energy-saving Air Conditioning Equipment Co., Ltd.
Contact:Mr. Wang
Free Hotline:4008-8383-95
Company Email:sales@trlon.com
Web Site:https://www.trlen.com/
Company Address: 1916A, Block A, David Donglong Business Building, Longhua, Longhua District, Shenzhen